by
Denny Whitmire
| Jan 23, 2012
t![2012-01-12_14-48-41_71 Whitmire Grading is very well versed in water utility construction in the Bumcombe, Henderson, Transylvania county water authorities.](/images/default-source/archive/grading-construction-western-nc-agriculatural-center-water-system.jpg?sfvrsn=8)
WNC Agriculture Center utility master water meter installation with backflow prevention near Asheville Regional airport.
This concrete pad will have a heated housing over it to prevent freezing.
Following 9-11, it became state standards to use these type of systems to protect our city water supply from creating a wide-spread attack with something like anthrax.
These type of systems protect the city water supply from contaminants in a building's sprinkler fire protection system.